000 Troy Smith Road
About this property
Adjacent to the The Toyota Manufacturing Megasite .. The Toyota Battery Manufacturing Plant is projected to begin production in 2025. The city of Greensboro has an agreement with Toyota Battery to provide water and sewer within a 1 mile radius of the Megasite, but only if developed as industrial. If zoned Residential can be developed with well/septic. .
About this property
Adjacent to the The Toyota Manufacturing Megasite .. The Toyota Battery Manufacturing Plant is projected to begin production in 2025. The city of Greensboro has an agreement with Toyota Battery to provide water and sewer within a 1 mile radius of the Megasite, but only if developed as industrial. If zoned Residential can be developed with well/septic. .
Features and Additional Information
Presented By Coldwell Banker Summit
Area Information
Randolph | Randolph County |
Schools in the Area
-
turned_in
Elementary School
-
turned_in
Middle School
-
turned_in
High School
Want to See More Listings in the Area?
Brokerage: WEST MARKET REALTY CO.